Bergen New Bridge COVID-19 Alternate Care Facility

Paramus, NJ

Within 24 hours of receiving notice of the award, Conti Federal deployed to begin the conversion of a hospital gymnasium into a space capable of providing care for up to 30 COVID-19 patients.

This project converted an existing hospital gymnasium and adjacent areas into a space capable of providing care for up to 30 COVID-19 patients. The project was located at the Bergen New Bridge Medical Center in Paramus, NJ in Bergen County, which was the epicenter of the state’s COVID-19 outbreak. Despite the hospital’s 1,000-plus beds, healthcare experts doubted the County had adequate space available to care for the anticipated wave of COVID-19 victims. As part of a state-wide initiative to address this lack of available beds, New Bridge was selected to receive the new 30-bed ACF.

The ACF is located in an existing gymnasium within the hospital complex, with basketball hoops, hardwood floors, and cinderblock walls. The Conti team designed and made several modifications to address the requirements to care for COVID-19 patients. Deploying in only 24 hours time, the team had to begin work without a complete set of drawings. The ACF’s confined area—totaling approximately 6,000 SF—also presented a challenge, as work in such a tight space presents numerous safety risks.

Up to eight scissor lifts were in operation simultaneously, operating on a temporary base of plywood sheeting to protect the newly installed floor. Many lifts contained two laborers each, and sometimes with employees from three different companies up in the air, all while up to a dozen other laborers worked below the lifts. Given that work was underway in 12-hour shifts for 14 consecutive days, the risk of workers becoming tired and losing focus was high. These challenges were further compounded by the project’s COVID-19 protocols, which necessitated everyone wear a face mask and maintain a six feet of distance from one another whenever possible.

Despite the compressed project schedule, the team deliberately slowed our pace to prepare for each project step. This included making a full stop before each new activity to make certain the crew understood the task and was ready to execute the work as required. More subjective steps, such as making eye contact with each crew member, making clear the schedule was no excuse to skirt safety measures, and emphasizing the importance of watching out for one another, were also critical to keeping the project safe. Despite the increased safety risks, the team worked several thousand total manhours, 24-hours-a-day, 7-days a week, without a single incident in completing the project.

Conti Federal completed this demanding project in only 14 days.

Project details

Client USACE Philadelphia
Value $3.9M
Status Completed
Key features
  • Heating and cooling HVAC system capable of processing 6 air changes and 2 fresh air changes per hour
  • Electrical system upgrades to support patient power supply (including emergency power supply) needs as well as the new HVAC and sprinkler systems
  • A new, hospital-grade seamless floor
  • Partitions with data wiring for patient care “pods”
  • Nurses’ station
  • “Pillow controls” to connect each patient pod to the nurses’ station for calls
  • Fire detection and alert system and a sprinkler system
  • Furnishings, fixtures, and equipment (FF&E) including beds, sinks, and lights

Israeli Air Force Bases 1 and 2: Motor Wing, Runways, and North Gate

Israeli Air Force Bases 1 and 2: Motor Wing, Runways, and North Gate

Israel’s primary spaceport and one of its most technologically advanced air force bases requires the most up-to-date facilities to operate on the highest level.

Read more

Carmell Ridge Temporary Housing Site

Carmell Ridge Temporary Housing Site

The Federal Emergency Management Agency (FEMA) directed the United States Army Corps of Engineers (USACE) to develop and install recovery centers in response to the impact of several devastating hurricanes and Florida’s need for emergency assistance.

Read more

Hurricane Sandy Disaster Recovery

Hurricane Sandy Disaster Recovery

Conti mobilized 100% of project crews within four days to clear 174,000 tons of hurricane waterway debris along the Atlantic Coast.

Read more