The projects include site building demolition, asbestos abatement, site pavement and utility demolition, utilities, pavements, site drainage and construction of a 20,000 square-foot Flight Simulator Facility building and a 33,729 square-foot Squadron Operations/Aircraft Maintenance Unit (Sq OPS/AMU) building. The total building demolition is 8,009 square feet.
The one-story Simulator building will house four Full Mission Simulators and will have a reinforced concrete foundation, a structural steel frame, and a standing seam metal roof. The exterior walls will be 4-inch split face masonry and the windows with insulated glass with a laminated interior pane in accordance with UFC4-010-01. The facility’s architectural appearance will comply with the NAS Fort Worth Installation Appearance Plan. The secured portion of the building contains the simulators, computer equipment rooms, debriefing rooms, helmet storage, maintenance rooms, secure communications, and secure storage and will be constructed in accordance with ICD 705. The unsecured portion of the facility will include open and private offices, break rooms, and rest rooms.
The two-story Squadron Operations/Aircraft Maintenance Unit (Sq OPS/AMU) building will have a reinforced concrete foundation, a structural steel frame, and a standing seam metal roof. The exterior walls will be 4-inch split face masonry and the windows with insulated glass with a laminated interior pane in accordance with UFC4-010-01. The facility’s architectural appearance will comply with the NAS Fort Worth Installation Appearance Plan. The Sq OPS/AMU building will provide spaces on the first floor for the Aircraft Maintenance Unit. AMU spaces include equipment maintenance, ready room, administrative offices, locker rooms, and rest rooms. The Squadron Operations will be on the second floor and include a large secure area meeting ICD/ICS 705 requirements and an unsecured portion that includes administrative offices, flight operations desk, conference rooms, and support spaces.