This project delivered second set of F-35 beddown hangars and supporting facilities for the Israeli Air Force. Work included hardened facilities, blast protection gates, an underground utility corridor, complex mechanical and electrical systems, and a site-specific building management system (BMS). In total, Conti Federal delivered 23 facilities, completing all structural concrete work and structures in 14 months from the Notice to Proceed (NTP).
Construction included aircraft maintenance support spaces, including: hangars, auxiliary facilities, and a two-story secure planning and operations squadron administrative building, and an ammunition storage area. The project also include site development (sidewalks and water culverts), parking spaces, roads, and junctions.
Conti Federal constructed components in compliance with ICD 705 specifications and fitted out secure operations planning and administrative spaces within the squadron administrative building. These facilities are used by authorized personnel as fully functional secure spaces to store, discuss, and/or electronically process secure data.
The project was performed on an active military base adjacent to an active flight line and involved new construction on predominantly undisturbed land and tied into existing utilities with the project’s footprint nearby. The project’s magnitude and sequencing, coupled with contractually required First Article acceptance tests, compounded one another, and required close attention to maintain schedule. Conti Federal met and exceeded schedule management requirements by planning for the entire project, as well as tracking several “look ahead” horizons for each discipline, all while coordinating between and among the various disciplines.