Southeast Louisiana Drainage Program New Pumping Stations

Jefferson Parish, LA

To reduce damages from rainfall flooding in New Orleans and the surrounding parishes, the Southeast Louisiana (SELA) Drainage Program constructed new pumping stations and better drainage canals and culverts throughout the area.

Originally authorized in 1996, Congress appropriated federal funds to develop solutions to the flooding problems in Orleans, Jefferson and St. Tammany parishes in the aftermath of Hurricane Katrina in 2005. The United States Army Corps of Engineers (USACE) started working on these flood protection projects to protect against a ten-year rainfall event and reduce damages for larger events.

Conti constructed SELA-07b consisting of three 84-inch cement lined steel pipes connecting the discharge pipes from a pump station to a levee crossing and outlet structure for discharge into the Mississippi River. Work included construction and modification of existing utilities, construction of two pump stations including concrete foundations and fiberglass wet wells, pile driving, installation of waterline, mass excavation and hauling, asphalt and concrete paving, dewatering, construction of temporary retaining structures, stone and bedding construction, structural excavation, backfill and demolition.

Conti laid as much as 600 linear feet of pipe per month and coordinated with USACE, the Louisiana Department of Transportation and Development, the local utility company and Jefferson Parish to redesign the traffic configuration, temporary retaining structure (TRS) and dewatering system to improve efficiency.

To reduce damages from rainfall flooding in New Orleans and the surrounding parishes, the Southeast Louisiana (SELA) Drainage Program constructed new pumping stations and better drainage canals and culverts throughout the area.

Project details

Client USACE New Orleans
Value $23.8M
Status Completed
Key features
  • Constructed two pump stations
  • Installed 13,500 linear foot 84-inch steel discharge pipe, 4,500 linear feet TRS, 12 catch basins and 1,500 linear feet storm drain pipe
  • Installed 1,500 tons asphalt and 250 cubic yards concrete
  • Drove 2,375 linear feet steel H-piling
  • Installed 17,750 linear feet silt fence
  • Excavated and disposed of 138,000 cubic yards soil
  • Installed 4,000 linear feet 12-inch waterline

Israeli Air Force Bases 1 and 2: Motor Wing, Runways, and North Gate

Israeli Air Force Bases 1 and 2: Motor Wing, Runways, and North Gate

Israel’s primary spaceport and one of its most technologically advanced air force bases requires the most up-to-date facilities to operate on the highest level.

Read more

Carmell Ridge Temporary Housing Site

Carmell Ridge Temporary Housing Site

The Federal Emergency Management Agency (FEMA) directed the United States Army Corps of Engineers (USACE) to develop and install recovery centers in response to the impact of several devastating hurricanes and Florida’s need for emergency assistance.

Read more

Hurricane Sandy Disaster Recovery

Hurricane Sandy Disaster Recovery

Conti mobilized 100% of project crews within four days to clear 174,000 tons of hurricane waterway debris along the Atlantic Coast.

Read more