Washington, DC
The power plant’s security is of utmost importance as it is critical infrastructure for the smooth functioning of the federal government. The Architect of the Capitol (AOC) sought to upgrade the plant's facility security improvements in and around the building.
Conti provided physical perimeter security upgrades for the power plant using a design-build approach. The project included civil work for the installation of 94 bollards, two vehicular barriers and K-rated security fencing, along with various other construction efforts. Conti deployed numerous Value Engineering (VE) methods. For example, when the initial scope called for the construction of concrete police shelters, the team determined that structural steel shelters would provide the same strength, meet security requirements, provide mobility and be easy to erect. This VE provided cost-savings to the client and resulted in a more robust security system.
Executing this project required secret security clearances as well as the agility and responsiveness to work safely and flexibly in operating facilities while meeting exacting requirements. Tight coordination was crucial to project success due to high security levels and the multiple agencies involved. Conti used Project Talk, an online collaboration tool, to maintain a quick and transparent communication process.
Conti modified work plans and designs so disruption of daily power plant activities was significantly reduced.
Conti provided a robust physical perimeter security system for the US Capitol’s power plant.
Client | Architect of the Capitol |
---|---|
Value | $2.8M |
Status | Completed |
Key features | |
|
Israel’s primary spaceport and one of its most technologically advanced air force bases requires the most up-to-date facilities to operate on the highest level.
The Federal Emergency Management Agency (FEMA) directed the United States Army Corps of Engineers (USACE) to develop and install recovery centers in response to the impact of several devastating hurricanes and Florida’s need for emergency assistance.
Conti mobilized 100% of project crews within four days to clear 174,000 tons of hurricane waterway debris along the Atlantic Coast.