Lakehurst, NJ
Providing the United States with global mobility since 1942, the McGuire Air Force Base houses technologically advanced C-17 Globemaster transport airplanes and serves as a crucial fixture of America’s Air Force. The C-17 is needed to conduct training exercises, prompting the Naval Facilities Engineering Command (NAVFAC) to call for the construction of a new C-17 Assault Landing Zone (ALZ) runway. The purpose of this project was to enable a larger number of C-17s to perform the required training locally rather than travel out of state, saving valuable time and fuel.
Conti constructed the new, high-quality C-17 ALZ runway, including shoulders, overruns, pavement markings, marking panels and lights and modifications to adjacent runway and taxiways. The project team worked on a fast-paced schedule through harsh winter months to complete construction. Grading and pouring concrete became increasingly more challenging as the winter temperatures dropped, so the team utilized advanced heating techniques throughout these stages to keep the project on track.
An additional threat to project scheduling was site security, as all concrete and stone trucks had to undergo comprehensive and time-consuming inspections by base security every time they entered the facility. This required thorough planning of each delivery many days in advance. All of these measures resulted in successful, safe project completed on schedule and budget.
“It was a breath of fresh air to work with such a professional and capable contractor.” – Lt. Curtis Ray, NAVFAC Project Engineer
Client | Naval Facilities Engineering Command Mid-Atlantic |
---|---|
Value | $14.5M |
Status | Completed |
Key features | |
|
Israel’s primary spaceport and one of its most technologically advanced air force bases requires the most up-to-date facilities to operate on the highest level.
The Federal Emergency Management Agency (FEMA) directed the United States Army Corps of Engineers (USACE) to develop and install recovery centers in response to the impact of several devastating hurricanes and Florida’s need for emergency assistance.
Conti mobilized 100% of project crews within four days to clear 174,000 tons of hurricane waterway debris along the Atlantic Coast.