Annual Jet Fuel System Testing

Worldwide

Conti coordinated with active air field operations to test and remediate over 100 jet fuel pipeline systems in locations worldwide.

Leaks in jet fuel gas pipeline systems disrupt the Air Force’s ability to maintain tight flight schedules at various Department of Defense (DOD) air fields. In response, the Air Force Civil Engineer Center (formerly Air Force Center for Engineering and the Environment) initiated the Hydrant Fuel System program to providing for annual tightness testing, monthly monitoring and repair response to suspect leaks in the gas pipelines.

Conti provided permanent leak detection system installation, pipeline construction, tank gauge supply and replacement and secondary containment repair and certification. Task order locations included defense facilities in 33 US states and 8 other countries (Japan, Korea, Turkey, Spain, Italy, Greece, Germany and the United Kingdom).

Project teams rapidly mobilized to keep ahead of the Air Force’s annual reporting needs. Conti pooled its resources with subcontractors, creating dedicated activity-specific project teams to deploy consistent resources familiar with the work activities. On-site Conti crews worked diligently to plan and execute all leak tests and repairs quickly, as the bases needed work to be completed on a time-accelerated schedule.

Conti performed pipeline leak investigations, repair, excavation, screening and sampling, soil segregation and stockpiling, removal of failed pipelines and installation of new pipelines during active air field operations and finished without having to temporarily close any DOD facilities.

Conti managed more than 40 task orders simultaneously to keep flight operations running, coordinating with active air fields to test and remediate over 100 pipeline locations worldwide.

Project details

Client Air Force Civil Engineer Center
Value $8M
Status Completed
Key features
  • Installed and constructed permanent leak detection systems
  • Constructed and repaired pipelines
  • Repaired and certified secondary containment
  • Supplied and replaced fuel storage tank gauge and associated hydrant system appurtenances
  • Restored and remediated site areas and structures

Hurricane Sandy Disaster Recovery

Hurricane Sandy Disaster Recovery

Conti mobilized 100% of project crews within four days to clear 174,000 tons of hurricane waterway debris along the Atlantic Coast.

Read more

Lakehurst Training Facility

Lakehurst Training Facility

Conti’s LEED Silver qualified facility provided more than $1.5 million in cost savings for the New Jersey Department of Military and Veteran Affairs.

Read more

C-17 Assault Landing Zone

C-17 Assault Landing Zone

Innovative methods to increase productivity and collaborative problem-solving to mitigate unforeseen conditions made this a successful project for Conti and the Navy.